Reviewing Your Proposed Work

An extension or loft conversion can raise questions about shared walls and neighbouring foundations. We check your plans early, so you know which notices are needed before agreeing a start date. That includes reviewing beam bearings, foundation depths and the position of new walls.

If the drawings leave a foundation depth or structural connection unclear, we ask your architect or engineer for the missing detail. The notices can then describe the proposed work properly, reducing the need for revisions as the Party Wall procedure progresses.

We advise on projects involving:

  • loft conversions with beams bearing into a party wall
  • extensions and new walls at the boundary
  • removal of chimney breasts from a party wall
  • raising, rebuilding or altering a party wall
  • excavation for foundations near neighbouring buildings
  • basements, underpinning and deeper excavation.

Preparing Party Wall Notices

We check the ownership information before preparing and serving notices on the adjoining owners. This can include freeholders and qualifying leaseholders, so a notice to the person living next door may not reach everyone who must be notified.

An excavation notice must include plans and sections showing the position and depth of the work. For Party Structure and excavation notices, the notified work must begin within 12 months of service and then proceed without undue delay, so notice dates need to fit the construction programme.

The notices describe the proposed work and intended start date, with supporting plans and sections where required. The minimum notice periods are:

  • One month for a Line of Junction Notice under section 1.
  • Two months for a Party Structure Notice under section 3, covering work to existing party structures.
  • One month for a Notice of Adjacent Excavation under section 6.

The Response & Surveyor Appointment

Responses to Party Wall Notices

Consent to the Work

Where the adjoining owners consent in writing, an initial Party Wall Award is not normally needed, although you can still agree to have their property’s condition recorded before work starts. Consent does not remove your responsibility for damage caused by the work or the neighbour’s rights if a dispute arises later.

Dissent or No Reply

With Party Structure and excavation notices, a dispute arises if the adjoining owner dissents or does not consent in writing within 14 days of service. Surveyors are then appointed under section 10 to settle the matters in dispute and set out how the work is to be carried out.

The Line of Junction procedure for new boundary walls is different: a new wall astride the boundary needs the adjoining owner’s written consent. Without it, the wall must be built wholly on your own land after the relevant notice period.

Appointing Party Wall Surveyors

Once a dispute has arisen, each owner can appoint a surveyor, or both can agree in writing to use one Agreed Surveyor. Where separate surveyors are appointed, they select a Third Surveyor to whom either owner or appointed surveyor can refer matters under the Act.

As Building Owner’s Surveyor, we examine the drawings and construction methods, consider their effects on the adjoining property and work with the other appointed surveyor to settle the matters in dispute. All appointed surveyors must act impartially, considering both owners’ rights under the Act.

This can involve resolving details of access, temporary protection and the sequence of construction with your architect, structural engineer and contractor. Addressing these before the relevant work begins gives the project team the information needed to comply with the Party Wall Award.

Existing garage floor, opening and interior condition
A dated record before building work

Recording Your Neighbour’s Property Condition

Before the notifiable work begins, we record the condition of the parts of the adjoining property relevant to the proposals. Written descriptions and photographs document existing cracks, finishes and other visible defects, providing a dated record if damage is reported later.

Access needs to be arranged before construction affects those areas. The surveyors can then compare conditions before and after the work, alongside other evidence, to assess whether any reported damage is related to it.

What the Party Wall Award Covers

A Party Wall Award records the surveyors’ decision on the matters in dispute and sets out how the notified work is to be carried out. Depending on the proposals, it can cover:

  • the works authorised under the Act
  • drawings and construction methods
  • when and how the work takes place
  • access needed to carry out the work
  • protection of the adjoining property
  • making good damage or payment in lieu
  • security for expenses where applicable
  • reasonable surveyor costs.

Planning Permission and Building Regulations approval must be dealt with separately, and an Award cannot decide who owns disputed land.

Changes During Construction

If the design or construction method changes, send us the revised details before the affected work is carried out. The changes may need agreement or a further Award; if they extend beyond the original notices, fresh notice may also be required.

Frequently Asked Questions

Can I serve Party Wall notices myself?

You can prepare and serve the initial notices yourself. They must identify the correct owners and describe the work with the details required by the Act. We can prepare and serve them for you, particularly where the work involves several properties, leasehold interests or complex construction.

Can I start work as soon as my neighbour consents?

Written consent to the work does not automatically shorten the notice period. An earlier start also needs written agreement; where a dispute has arisen, the Award must be served and its conditions satisfied before the work it covers begins. Planning and Building Control requirements still apply.

What if my neighbour does not appoint a surveyor?

After a dispute arises, a written request can be served requiring the adjoining owner to appoint a surveyor. If they do not appoint within ten days, beginning with the day the request is served, the Building Owner can appoint a separate surveyor on their behalf under section 10(4).

Can I challenge a Party Wall Award?

Either owner may appeal to the county court within 14 days, beginning with the day the Award is served on them. Because the time limit is short, take legal advice promptly if you intend to challenge an Award.

Who pays the Party Wall surveyors?

The Building Owner normally pays the reasonable surveyor costs for work carried out for their benefit. The appointed surveyors determine how costs are allocated under the Act, taking account of the work and circumstances, so a different allocation may be appropriate where both owners benefit.

Can an Award allow work over the boundary?

An Award does not transfer land or settle a disputed boundary, although the Act provides limited rights for certain works, including some projecting foundations. A new wall astride the boundary needs the adjoining owner’s written consent, as do special foundations on their land. These requirements need to be considered when the foundations and wall positions are designed.

Related Services & Guidance