Building Owner’s Surveyor

If your work affects a shared wall or nearby property, we check which Party Wall notices are needed. We can serve them and act as your surveyor if a dispute arises.

Adjoining existing brick and rendered houses

Adjoining Owner’s Surveyor

We explain your options when a neighbour serves a Party Wall notice. If appointed, we review the proposals, record your property’s condition and address protection and damage through the statutory process.

Existing eaves and gutter condition recorded beside an adjoining building

Agreed Surveyor

Both neighbours can appoint one impartial surveyor to handle a Party Wall dispute. We review the work, record condition and prepare the Award setting out how it may proceed.

Adjoining cottage walls and roof junctions, illustrating the relationship between neighbouring properties

Party Wall Notices & Awards

Party Wall notices describe the proposed building work. If a dispute arises, an Award sets out how it may proceed, with safeguards and a record of the neighbouring property’s condition.

Brick and rendered external walls with windows and eaves

When Is a Party Wall Notice Needed?

Existing Party Structures

Work such as inserting steel beams, removing a chimney breast or raising or rebuilding a party wall may need notice. The Act can also cover party structures separating flats, including floors and partitions, so it is not limited to walls between houses.

New Walls at the Boundary

Section 1 can apply when a new wall is built up to or astride the boundary, known as the line of junction. A new wall astride the boundary needs the adjoining owner’s written consent; without it, the wall must be built entirely on the Building Owner’s land.

Excavation Near Neighbouring Buildings

Excavation can require notice under section 6 even where the buildings do not share a wall. Within three metres of a neighbouring building or structure, the key test is whether the excavation will go below the bottom of its foundations.

Within six metres of that building or structure, the test uses a 45-degree plane drawn down towards the work from the outside face of the neighbour’s wall, starting at the level of the bottom of its foundations. Notice is required if the proposed excavation or construction meets that plane.

Planning Approval & Boundary Rights

Party Wall procedures are separate from Planning Permission and Building Regulations. Approval under either system does not remove the need to serve Party Wall notices where the Act applies, and an Award does not replace those approvals.

An Award deals with matters within the Act; it does not decide who owns disputed land. If the boundary itself is uncertain, that issue may need a separate investigation before the proposed work can be assessed.

Frequently Asked Questions

How early should I arrange Party Wall notices?

Allow for notices and any Award while the drawings are being prepared: Party Structure notices need at least two months, and Line of Junction and excavation notices at least one month, unless an earlier start is agreed in writing.

Do I have to appoint a Party Wall surveyor?

If the adjoining owners give written consent to the notified work, a Party Wall Award is not normally needed at that stage. Where a dispute arises under the Act, surveyors are appointed to settle it. A Schedule of Condition can still be useful after consent, as it records the property before work begins.

Who pays the surveyors?

The Building Owner usually pays reasonable surveyor fees where the work is for their benefit. Costs can be shared in other circumstances; where they are disputed, the appointed surveyor or surveyors decide how they should be allocated under the Act.

What happens if a neighbour does not reply?

For Party Structure and section 6 excavation notices, no written consent within 14 days is treated as a dispute under the Act, which surveyors are appointed to resolve. Silence in response to a section 1 notice does not automatically create a dispute, but it also does not give consent to a new wall astride the boundary.

Can both owners use one surveyor?

Both owners must agree in writing to appoint an Agreed Surveyor. If they prefer separate appointments, each chooses a surveyor and both must act impartially under the Act. A neighbour’s failure to reply does not amount to agreement to use the same surveyor.

What if work starts without a notice?

If work that required notice has started without one, seek advice promptly and keep a dated record of the property’s condition. Surveyors cannot simply issue a retrospective Party Wall Award to bring that work under the Act; legal advice may be needed about stopping the work or seeking another remedy. Our guide to work started without a Party Wall notice explains what to consider.