If Work Is Still Underway
If excavation, demolition or structural alterations are affecting your property, get advice while the relevant work remains visible. Ask your neighbour for the current drawings and any Party Wall documents, and keep a dated record of what has happened.
Where work appears to need notice but the procedure has not been followed, a solicitor can advise whether an injunction or another remedy is appropriate. A court decides whether work should be stopped; we can inspect the construction and provide technical evidence to support that advice.
Was a Party Wall Notice Needed?
We check whether the work involves a party structure, a new wall at the boundary or excavation meeting the Act’s depth and distance tests. Work entirely on the Building Owner’s land can still require notice, including a new wall built up to the boundary.
The drawings, foundation information and work visible on site help establish which requirements apply. Our guide to when a Party Wall notice is needed explains the common examples. An omitted notice does not by itself establish that the construction is unsafe or has caused damage; those questions need a technical assessment.

Recording the Work & Property Condition
We can inspect the affected property and prepare a condition record or defect report, documenting what is visible and the concerns that need investigation. A survey carried out now records the present condition, so earlier photographs or surveys are particularly useful when assessing whether damage is new.
Keep the following with dates and locations clearly identified:
- photographs or video of work visible from your property or public areas
- photographs of existing and newly reported cracks, finishes or other damage
- notices, drawings and correspondence with the neighbour or contractor
- the dates of excavation, steelwork and other relevant construction stages
- notes of movement, water ingress or any other change as it appears.
Notices & Retrospective Awards
Where No Notice Was Served
An Award cannot simply be used to regularise earlier work carried out without a valid notice. The Court of Appeal’s decision in Power v Shah (2023) explains why appointing surveyors afterwards does not, by itself, give them authority to settle the earlier dispute under the Act.
Work still proposed may be capable of following the notice and surveyor procedure, so we separate what has already been built from what remains to be done. A private agreement may help the owners resolve practical issues, but it is not a statutory Party Wall Award.
Where a Notice Was Served
If a notice was served, send us the notice, supporting drawings, responses and any surveyor appointments. The issue may concern its contents, the owners it reached, its timing or an unfinished procedure. We review those documents and the sequence of events before advising what can still be dealt with under the Act.
If Your Property Is Damaged
Photograph the damage and record when it appeared, then arrange an inspection before repairs conceal the evidence. Necessary emergency work should not be delayed simply to preserve a record. We assess the likely cause, the repairs needed and whether further investigation or structural engineering advice is required.
Where a valid notice has brought the work within the Party Wall procedure, the appointed surveyors may be able to resolve the damage dispute. Otherwise, a solicitor can advise on a claim based on matters such as negligence, nuisance or trespass, using the survey findings and other evidence to assess responsibility.
If You Are Carrying Out the Work
If you discover that notice may have been required, seek advice promptly about the affected operations and any temporary protection needed. Provide the drawings, correspondence, dates and a clear account of the work completed, together with the construction still planned.
We can identify remaining work that needs notice and assess reported damage or other technical concerns. This helps you and your advisers address the earlier work while establishing the correct procedure for the next stages, rather than relying on a late notice to cover the whole project.
Frequently Asked Questions
Can the owners agree a way forward?
The owners may be able to agree practical arrangements for access, protection, inspections or repairs. Put those arrangements in writing and obtain legal advice where they involve responsibility for damage, payment or property rights. A private agreement does not become a Party Wall Award merely because a surveyor helps prepare it.
What if the work is already finished?
An inspection can still help assess damage, identify repairs and record the condition of the property. Provide earlier photographs, survey reports and correspondence, as some construction details may now be concealed. The available evidence and notice history will help your advisers establish how any claim should be pursued.
Will my neighbour have to pay for my surveyor?
Do not assume the neighbour must pay simply because no notice was served. The normal Party Wall fee provisions depend on a valid statutory procedure. If that procedure does not apply, ask your solicitor about the prospects of recovering inspection and other professional costs before incurring them.
What if the builder says a notice was not needed?
Ask which drawings and construction details support that view. We can review the work to shared structures, the position of new walls and the excavation depths against the Act’s requirements. The actual design and site conditions determine whether notice was needed.