Check the Property before Settling the Design

Permitted Development rights allow certain work without a full Planning application, provided every relevant limitation and condition is met. We check the property and the complete proposal together, including earlier extensions and alterations.

Planning conditions or an Article 4 direction may remove particular rights. Conservation areas and other designated land introduce further restrictions; flats, maisonettes and some converted houses do not have the same rights as ordinary houses.

Our householder advice concerns properties in England. Send the address, existing plans, any earlier permissions and a clear description of the work you want to carry out.

Existing house with a projecting study extension beside the garden
Existing buildings & earlier additions
Garden and driveway beside an existing house and veranda
The house, garden & available space

Extensions, Loft Conversions & Garden Buildings

House Extensions

We assess the proposed depth, width, height and position, its relationship to boundaries and the amount of the plot already covered by buildings. Side extensions and combined side-and-rear schemes need particular care.

The rules refer to the original house: as it stood on 1 July 1948, or as first built if later. Previous extensions count towards relevant limits even where they had Planning Permission, so remaining allowances cannot be judged from the latest proposal alone.

Loft Conversions

Roof additions are subject to several tests, including cumulative additional roof volume: normally up to 40m³ for terraced houses and 50m³ for other houses. Earlier roof additions count towards those limits.

We also consider roof height, position, materials, eaves and windows. Meeting the volume limit alone is insufficient, and structural design and Building Regulations still need attention.

Garden Rooms & Outbuildings

Householder outbuilding rights concern uses incidental to the enjoyment of the home. They do not provide a general route to a separate dwelling or primary living accommodation.

The building’s use, position, height, footprint and relationship to the house all matter. Within two metres of a boundary, the overall height limit is normally 2.5 metres, but satisfying that condition alone does not establish Permitted Development.

Lawful Development Certificates & Prior Approval

Lawful Development Certificate

A certificate for proposed work formally establishes whether the specific scheme would be lawful for Planning purposes. It is not compulsory for every Permitted Development project, but provides a useful record before construction and for a later sale or remortgage.

We prepare the drawings and supporting evidence needed to assess the proposal against the relevant rules. The certificate applies to the scheme described and shown.

Prior Approval

Some rights require a prior approval process before work starts. For qualifying larger single-storey rear extensions, this can apply between four and eight metres for detached houses, or three and six metres for other houses.

The neighbour consultation and prior approval procedure must be completed before building. Other eligibility conditions still apply, and a Lawful Development Certificate does not replace this procedure.

Drawings & Application Documents

We agree the survey, design and application work your proposal needs. The package can include:

  • A measured survey and existing plans, elevations and sections
  • Proposed drawings showing the work and relevant dimensions
  • Site and location plans, boundaries and neighbouring relationships
  • Evidence of the original building and previous alterations
  • The appropriate application forms and supporting explanation
  • Submission and responses to the authority’s relevant queries

If the scheme falls outside Permitted Development, we explain whether design changes or a Householder Planning application offer the appropriate next step.

What to Resolve before Building

Technical Design & Building Regulations

A Planning decision or certificate does not supply the construction details needed by a builder. Structure, fire safety, insulation, ventilation and drainage may require coordinated technical drawings, calculations and Building Regulations approval.

Building Regulations Applications

Other Consents & Private Rights

Listed Building Consent, Party Wall procedures, drainage agreements, lease restrictions and other private rights may need separate attention. A Planning certificate does not override them.

Tell us about a listed building, shared wall, nearby drain or leasehold interest at the outset so the next stages can be identified.

Arranging Permitted Development Advice

  1. Send the Address & Your Brief

    Tell us what extra space or changes you need, with available plans, photographs and the property’s Planning history.

  2. Check the Rights & Develop the Drawings

    We check which rights apply, confirm whether a measured survey is needed, and prepare the agreed drawings and application documents.

  3. Confirm the Position before Starting

    Complete any required prior approval process and establish the Planning position. Then resolve the separate technical design and approvals needed for construction.

Frequently Asked Questions

Can I start without making an application?

Some work can proceed without a Planning application when the property benefits from the relevant Permitted Development rights and every applicable requirement is met. Where prior approval is required, its procedure must be completed before starting. We check the route for your proposal and can advise whether a Lawful Development Certificate would provide useful confirmation.

What if I change the design after receiving a certificate?

A Lawful Development Certificate relates to the proposal described in the application and drawings. Changes to dimensions, roof form or position may alter the Planning position, so revised designs should be checked before they are built. A new application may be needed to obtain confirmation for the changed proposal.

Can a listed building use Permitted Development rights?

Listing does not remove every Permitted Development right, but the relevant rules must be checked carefully. For example, the usual garden-outbuilding rights do not apply within a listed building’s curtilage. Listed Building Consent is a separate requirement for changes affecting the building’s special architectural or historic character.

Can neighbours object to Permitted Development?

A neighbour’s objection does not, by itself, remove a Permitted Development right. For larger rear extensions, neighbours are consulted and an objection can trigger the authority’s assessment of the effect on adjoining premises. Private rights and any Party Wall requirements remain separate from that Planning procedure.

Do the same rules apply to commercial premises?

Commercial properties have different Permitted Development rules from houses. The existing use, proposed development and site restrictions determine which rights may be available and whether prior approval is needed. We assess commercial proposals separately rather than applying house-extension allowances to offices, yards or other business premises.

What if a Lawful Development Certificate is refused?

The reason matters: the authority may need better evidence, or the proposal may not meet the relevant rules. We review the decision and explain whether further information, a revised design or an application for Planning Permission is the appropriate next step.