Level 2 and Level 3 at a Glance
Choose the survey around the building, its condition and your plans. The difference is the depth of inspection and advice, as well as the detail in the report.
| What matters | RICS Home Survey (Level 2) | Full Building Survey (Level 3) |
|---|---|---|
| Typical property | A conventionally built house or flat in reasonable condition, without extensive alterations. | An older, unusual, extensively altered or poorly maintained property, or one where major work is planned. |
| Report detail | Significant defects, condition ratings, repair and maintenance advice, and checks to arrange before committing. | A fuller explanation of construction, defects, likely causes, repair options and future maintenance. Our reports include priority ratings. |
| Inspection depth | A visual inspection of accessible parts of the property. | A more extensive inspection of accessible areas, with additional checks where safe and practicable. |
| Repair budgets | Contractor quotations or separately agreed cost advice are needed for budgeting. | Detailed repair advice does not automatically include cost estimates. Ask us to agree any budget advice before booking. |
Our standard service is for the survey only. A mortgage valuation serves the lender’s purpose and does not replace a survey for you as the buyer.
Choose a Level 2 Home Survey When
- the house or flat is of conventional construction;
- the property appears to be in reasonable condition;
- there have not been extensive alterations;
- you need a clear account of significant defects and repairs without the depth of a Full Building Survey (Level 3).
From £425 + VAT
Choose a Full Building Survey (Level 3) When
- the property is older, listed or traditionally constructed;
- it has been substantially extended, altered or converted;
- the construction is unusual;
- the building is in poor condition or significant defects are suspected;
- you plan major refurbishment and need more detailed repair advice.
From £525 + VAT
What the Inspection Can Establish
Both surveys assess accessible construction and record restrictions on the inspection. Fixed finishes and floorboards are not removed; opening up concealed construction needs a separate agreement.
Level 2 does not involve lifting floor coverings. At Level 3, corners of loose, unfitted coverings may be lifted where practicable and safe. Accessible roof spaces, drainage and services also receive a more detailed inspection, subject to access and conditions at the property.
Neither service includes electrical, gas or other specialist safety testing. At Level 3, services are observed in normal use where safe; that observation does not certify their safety. The report explains where specialist checks or further investigation are needed.
Inspection guidance: RICS Level 2 scope and RICS Level 3 scope.
Extensions, Loft Conversions & Alterations
One extension does not automatically require a Full Building Survey (Level 3). The number, complexity and quality of alterations matter, as do missing approvals, structural changes and the relationship between old and new construction.
Where a loft conversion has no Building Regulations approval, read our separate guide before deciding what additional investigation is needed.
My Loft Conversion Has No Building Regulations Approval – What Can I Do?Add a Closer Inspection of the Roof
A drone inspection can be added to either survey to give closer views of roofs, chimneys and other high-level details. It depends on suitable weather, access and any required permissions. The surveyor considers the photographs and visible defects in the main report; concealed construction may still need further investigation.
Explore Drone Roof SurveysFrequently Asked Questions
Is a HomeBuyer Survey the same as a Level 2 Home Survey?
HomeBuyer Survey is the older terminology commonly used for the current RICS Home Survey (Level 2).
Is a Full Building Survey (Level 3) the same as a full structural survey?
“Full structural survey” is an older expression commonly used for a detailed building survey. Our Full Building Survey (Level 3) includes advice on defects and repairs, while remaining non-destructive. If a specific concern needs engineering assessment, we can discuss a separate structural engineering appointment.
Is Full Building Survey (Level 3) always better?
The right survey depends on the property. Level 2 may give you the advice you need for a conventional home in reasonable condition; Full Building Survey (Level 3) provides fuller investigation and reporting for older, altered or more complex buildings. Send us the particulars and your plans, and we will recommend the appropriate level.
Can you advise before I book?
Yes. Send the property listing and tell us about known alterations, condition and your plans.


